Denham Springs, LA
New construction asphalt paving. The pavement section included a 12-inch stone base, 3-inch binder and 1.5-inch top course, with 65 striped stalls.
Project-specific section. Not a standard specification.

PROJECTS / THE WORK IN DETAIL
A project archive of commercial paving, roads, milling, overlays and driveways. Each scope and quantity belongs to the individual project shown.
01 / NEW CONSTRUCTION / COMMERCIAL
Denham Springs, LA. New construction paving with a defined stone base, binder and top course.
Denham Springs, LA
New construction asphalt paving. The pavement section included a 12-inch stone base, 3-inch binder and 1.5-inch top course, with 65 striped stalls.
Project-specific section. Not a standard specification.
02 / ROAD MILLING & OVERLAY
A road mill and overlay project covering about 200,000 sq ft, with a 2-inch mill and 2-inch overlay.
The project covered 25 streets in one week, with about 2,400 tons installed. Quantities are approximate where noted.
03 / ROADS & ACCESS
Roadway paving.
04 / ROADS & ACCESS
Driveway and road paving covering 15,000 sq ft.
05 / COMMERCIAL PAVEMENT
Church overlay covering 35,000 sq ft.
06 / COMMERCIAL PAVEMENT
Excavation, binder and top course, paving and striping across 3,600 sq ft.
07 / NEW CONSTRUCTION / ASPHALT & CONCRETE
Asphalt paving with concrete curbing and a pad. Project location not shown.
The scope included 16,000 sq ft, an 8-inch stone base, 3 inches of 25mm asphalt and 2 inches of 9mm asphalt, plus concrete curbing and a pad.
Project-specific section. Not a standard specification.
08 / COMMERCIAL PAVEMENT
Milling and paving covering 7,000 sq ft.
09 / DRIVEWAY PAVING
Driveway excavation and paving across 3,200 sq ft, with a 3-inch binder course.
10 / DRIVEWAY PAVING
Farm lane and driveway paving covering 5,400 sq ft.
11 / DRIVEWAY PAVING
Full-depth driveway milling and paving across 1,900 sq ft.
12 / DRIVEWAY PAVING
Driveway binder and top course across 3,200 sq ft.
13 / DRIVEWAY PAVING
Driveway paving.
14 / YOUR PROJECT
Every pavement section and work scope depends on the project. Share your site details to start the discussion with our team.
Send the address, the type of property and a description of the work. Photos and approximate dimensions can help.
Our team reviews the information and discusses access, pavement condition, drainage and the intended use of the space.
Our team identifies the proposed preparation, materials and work limits so the estimate has a clear basis.
BEFORE THE WORK
No. The quantities and material sections shown belong to the individual projects. Our team defines a proposed section around the conditions and requirements of the property being reviewed.
The Caliber Collision project shown here is in Denham Springs, LA.
Yes. Our team reviews paving, milling and repair work for roads and HOA communities, including shared parking and access areas. Send the location and the proposed work limits to start the discussion.
START WITH THE PROPERTY
Tell our team about the property. Photos, an approximate size and your timing help us define the work.
Start with the site. Our team will review the scope.